TI20.io TechNews Independent daily digest of the public gematik repositories

Three new releases, 17 commits in fhir-igs-workflow, new ISiK branches

Releases epa3-basic-1.4.0, 5.3.1 and 3.0.5. In fhir-igs-workflow, PR #241 was merged; two new branches in spec-ISiK-Basismodul and one in techblog.

api-ncpeh

  • Branch origin/develop: 1 commit, domainobj-eped-b.yaml updated (10 insertions, 5 deletions).

app-referencevalidator-plugins

  • New tag/release: epa3-basic-1.4.0
  • Branch origin/main: 2 commits (release epa3-basic-1.4.0 and the corresponding "Publish Release"), 30 files changed (369 insertions, 377 deletions).

fhir-igs-workflow

  • Branch origin/develop: 17 commits, 94 files changed (2764 insertions, 1769 deletions).
    • Merge of pull request #241 (qa-error-codes).
    • Error codes and requirements: validation error codes removed from requests without a body; HTTP code 412 set for task status mismatch; Afo changed to task status mismatch; rulesets removed from the CapabilityStatements; code TIFLOW_AUTH_ROLE_NOT_ALLOWED removed from the CodeSystems; msg_deleted removed.
    • Concept maps: telemetry concept map recreated, concept maps split, errors in concept maps fixed.
    • Other changes: EU operations corrected, quality and alignment of requirements corrected, link to erp-chrg added, unresolved bibliography key in core corrected, build run, build records removed and added to .gitignore.
  • New state on origin/push-notifications: 22 commits, 110 files changed (3100 insertions, 1983 deletions).
    • Push notification message contents split by module.
    • Two merges from develop (containing the 17 commits listed above).
    • Requirements built, build artifacts added.
  • Deleted branch: origin/qa-error-codes

gematik.github.io

  • Branch origin/master: 1 commit ("created new html pages"), 2 files changed (30 insertions, 30 deletions).

isik-mock-server

  • New tag/release: 5.3.1
  • Branch origin/main: 1 commit ("Publish Release 5.3.1 (#25)"), 4 files changed (25 insertions, 15 deletions).

isik-testsuite

  • New tag/release: 3.0.5
  • Branch origin/main: 2 commits (release 3.0.5 and "Publish Release 3.0.5"), 3 files changed (12 insertions, 6 deletions).

spec-ISiK-Basismodul

  • New branch: origin/stufe-5/termin/ptdata-2004-qa (starting point "initial commit"; the history includes pull request #1330 on anfisk-554-update-requirement-text, release notes for version 5.1.3, changes to liabilities, methodology and wording in ISiKCapabilityStatementCompositionKonsumentenRolle, and pull request #1323 on anfisk-555-improve-examples).
  • New branch: origin/stufe-6/termin/ptdata-2004-include-qa (starting point "initial commit"; the history includes pull request #1334 on practitioner-feedback-anfisk-557 with changes to ISiKPersonImGesundheitsberuf.fsh, pull request #1329 on anfisk-554-update-requirements, and automatically generated FHIR files and SUSHI artifacts).

techblog

  • Branch origin/master: 8 commits, 2 files changed (341 insertions). Topics: title, excerpt and author added, link texts corrected, textual revision following a comment, translation of section 3.4 from German to English.
  • Branch origin/zd/legacy-index-2026: 3 commits, 1 file changed (63 insertions, 63 deletions); textual revision and translation of 3.4 into English.
  • New branch: origin/zd/techblog-26-final: contains the 8 commits from master, one further commit (image "zeigen problem lösen", <br> added) as well as dependency updates (json 2.20.0 → 2.21.2, concurrent-ruby 1.3.6 → 1.3.7, faraday 2.14.2 → 2.14.3, nokogiri 1.19.3 → 1.19.4), the rename of 2026-01-30-fhir-path-in-demis-part2.markdown to 2026-05-29-fhir-path-in-demis-part2.markdown, and further fixes.

At a glance

  • New releases: epa3-basic-1.4.0 (app-referencevalidator-plugins), 5.3.1 (isik-mock-server), 3.0.5 (isik-testsuite).
  • fhir-igs-workflow: 17 commits on develop (pull request #241 qa-error-codes merged, branch deleted); push-notifications with 22 commits, including the split of message contents by module.
  • spec-ISiK-Basismodul: 2 new branches (stufe-5/termin/ptdata-2004-qa, stufe-6/termin/ptdata-2004-include-qa).
  • techblog: new branch zd/techblog-26-final; 8 commits on master.

Summarised automatically from the commit histories and reviewed by an editor. The linked repositories are authoritative.

Sources

← All posts