DEMIS 2.15.2, ISiK Basismodul 5.1.3 and zeta schema 1.2.0 in the gematik repositories
api-ncpeh
Two parallel lines of development on the branch fix/ism-specification-contract (14 and 3 commits, merged into develop). The content covers corrections to the ISM specification contract: FHIR XML/JSON wire schemas made more precise, HTML response schemas defined, Arazzo source paths and domain references (FD, proxy) resolved, invalid Arazzo output schemas removed, and the diagram and wording of the flag query corrected.
DEMIS-Helm-Charts
Release of the chart version for the notification-processing-service as 2.15.2.
DEMIS-notification-processing-service
New tag/release: 2.15.2. The release removed 439 lines in 7 files. The Helm chart release carries the same version.
fhir-igs-workflow
Activity on several branches:
- develop/origin (13 commits, merged from two PRs #221, #229): descriptions of FHIR referencing and asynchronous flows revised (push notification delays, async consequences), descriptions re-imported from the "common" module, internal links unified.
- feature/generate-openapis (32 commits, 1032 lines): extension of the OpenAPI generation across several modules (ERP-CHRG, DiGA, RX, TI-Flow-Core incl. a new CapabilityStatement extension), new dev build 2.0.0-ballot.4, new error code TIFLOW_ACCESSCODE_MISMATCH, interaction change for RX consent (Delete → Conditional Single Delete), access rules for TI-Flow revised.
- TMD-3239 (new branch, 3 commits): link and description corrections on dosage in the Rx IG.
- Three feature branches deleted after merge (TMD-2983, TMD-3454, async-description).
gematik.github.io
New HTML pages created.
spec-ISiK-Basismodul
Activity on several parallel stages:
- main-stufe-6 (13 commits, PRs #1329, #1332, #1322): requirement texts updated, documentation on identifiers added, fix for the
complies-withextension, methodology and liability updates, automatically generated FHIR artifacts. - main-stufe-5 (9 commits, PR #1330): release notes for version 5.1.3 updated, requirement texts and methodology adjusted.
- Two Dependabot branches (firely-terminal-pipeline, setup-java) with the same content as main-stufe-6 (terminology package decision, improved examples).
- gh-pages: rebuild of 18,842 files by the automatic Stufe 6 pages update.
- New branch
stufe-6/all/add-operations-to-artifact-page-ptdata-2231. - Three branches deleted after merge (anfisk-554 in Stufe 5/6, ptdata-2346).
zeta
Branch feature/zeta-stufe-2 (9 commits): example configuration for the gematik telemetry service, ZETA flow diagram for configuration retrieval/caching updated, refactoring of the DPoP key pair generation and subject token creation in the token exchange flow, schemaVersion raised to 1.2.0 with the new error code rate_limit_exceeded, API documentation extended with caching details for well-known endpoints.
At a glance
- New releases: DEMIS-notification-processing-service 2.15.2 (+ associated Helm chart release).
- ISiK Basismodul: release notes for 5.1.3 (Stufe 5) and further development in Stufe 6, incl. a gh-pages rebuild of 18,842 files.
- fhir-igs-workflow: OpenAPI generation (ERP-CHRG, DiGA, RX, TI-Flow) with new dev build 2.0.0-ballot.4 and a new error code.
- zeta: schemaVersion raised to 1.2.0, new error code
rate_limit_exceeded, refactoring of DPoP and token exchange. - api-ncpeh: corrections to the ISM specification contract (schemas, domain references, diagram).
Summarised automatically from the commit histories and reviewed by an editor. The linked repositories are authoritative.